CONSTRUCTION OF AUTOMATIC CHANGE OVER WITH GENERATOR TRIP OFF

ABSTRACT 
As technological advancement has been on the increase in our society many have fallen in love with technology and world want to have a feel in virtually  to every thing they do.
A design has been made in combination of electrical and electronics to change over from one power sources to the other automatically and trip off generation after 40 seconds without going through the point for manual operation. This project writing were organized in according way for easy understanding  
 
TABLE OF CONTENT
Title page
Approval page
Acknowledgement
Abstract
Table of content 
Table of figure 

CHAPTER ONE  
1.0Introduction
1.1Design objectives 
1.2Significance of the project 
1.3 The project report  models relevant to the design  

CHAPTER TWO    
2.0Literature review 
2.1System component analysis
2.2Theories and models relevant to the design 

CHAPTER THREE    
3.0System design 
3.1Description of the system building blocks 
3.2System specification and block diagram
3.3Description of overall operation of the system 
3.4Complete circuit diagram of the system 

CHAPTER FOUR  
4.0Implementation testing and results 
4.1Packaging of the system 

CHAPTER FIVE  
5.0Cost analysis 
5.1Conclusions and recommendation/suggestion
For Further Implementation
References 

Subscribe to access this work and thousands more
Overall Rating

0

5 Star
(0)
4 Star
(0)
3 Star
(0)
2 Star
(0)
1 Star
(0)
APA

Research, A. (2018). CONSTRUCTION OF AUTOMATIC CHANGE OVER WITH GENERATOR TRIP OFF. Afribary. Retrieved from https://afribary.com/works/construction-of-automatic-change-over-with-generator-trip-off

MLA 8th

Research, Afri "CONSTRUCTION OF AUTOMATIC CHANGE OVER WITH GENERATOR TRIP OFF" Afribary. Afribary, 03 Feb. 2018, https://afribary.com/works/construction-of-automatic-change-over-with-generator-trip-off. Accessed 25 Apr. 2024.

MLA7

Research, Afri . "CONSTRUCTION OF AUTOMATIC CHANGE OVER WITH GENERATOR TRIP OFF". Afribary, Afribary, 03 Feb. 2018. Web. 25 Apr. 2024. < https://afribary.com/works/construction-of-automatic-change-over-with-generator-trip-off >.

Chicago

Research, Afri . "CONSTRUCTION OF AUTOMATIC CHANGE OVER WITH GENERATOR TRIP OFF" Afribary (2018). Accessed April 25, 2024. https://afribary.com/works/construction-of-automatic-change-over-with-generator-trip-off