ABSTRACT
The hoist scheduling problem is a critical issue in the design and control of many manufacturing processes. When the hoist number and tank numbers are very large, finding an optimal schedule is very hard. As a result of this, a lot of scheduling algorithms have been developed, and thus created a need to evaluate these algorithms. This calls for a cheap and efficient way of evaluating different hoist scheduling algorithms. To address this issue, I propose a generic simulator which will be a visual tool that will be developed with Java technology. The result of this work will help to reduce cost and also help to guarantee product quality in production lines.
CHIKA, E (2021). A Model-View-Controller Based Platform For The Modeling And Simulation Of The Hoist Scheduling Problem. Afribary. Retrieved from https://afribary.com/works/a-model-view-controller-based-platform-for-the-modeling-and-simulation-of-the-hoist-scheduling-problem
CHIKA, ELEONU "A Model-View-Controller Based Platform For The Modeling And Simulation Of The Hoist Scheduling Problem" Afribary. Afribary, 15 Apr. 2021, https://afribary.com/works/a-model-view-controller-based-platform-for-the-modeling-and-simulation-of-the-hoist-scheduling-problem. Accessed 16 Nov. 2024.
CHIKA, ELEONU . "A Model-View-Controller Based Platform For The Modeling And Simulation Of The Hoist Scheduling Problem". Afribary, Afribary, 15 Apr. 2021. Web. 16 Nov. 2024. < https://afribary.com/works/a-model-view-controller-based-platform-for-the-modeling-and-simulation-of-the-hoist-scheduling-problem >.
CHIKA, ELEONU . "A Model-View-Controller Based Platform For The Modeling And Simulation Of The Hoist Scheduling Problem" Afribary (2021). Accessed November 16, 2024. https://afribary.com/works/a-model-view-controller-based-platform-for-the-modeling-and-simulation-of-the-hoist-scheduling-problem