DESIGN AND CONTRUCTION OF AUTOMATIC PHASE SELECTOR

Abstract
As the growing population of human race widens the gulf between energy supply and energy demand, the imbalance in energy availability sent researchers into excavating for a way of settling this age long squabble. A lasting solution is vested on alternative use of the renewable energy source, a project that is yet to be widely applied. Hence, the continuation of the unsettled yearns for sufficient power. Consequently, the power lines are frequently over loaded resulting to a trip of power by the action of switch gears or by the load shading process undertaken by the distribution authorities.

Overall Rating

0

5 Star
(0)
4 Star
(0)
3 Star
(0)
2 Star
(0)
1 Star
(0)
APA

Raji, A. (2018). DESIGN AND CONTRUCTION OF AUTOMATIC PHASE SELECTOR. Afribary. Retrieved from https://afribary.com/works/design-and-contruction-of-automatic-phase-selector-7131

MLA 8th

Raji, Alex "DESIGN AND CONTRUCTION OF AUTOMATIC PHASE SELECTOR" Afribary. Afribary, 29 Jan. 2018, https://afribary.com/works/design-and-contruction-of-automatic-phase-selector-7131. Accessed 26 Dec. 2024.

MLA7

Raji, Alex . "DESIGN AND CONTRUCTION OF AUTOMATIC PHASE SELECTOR". Afribary, Afribary, 29 Jan. 2018. Web. 26 Dec. 2024. < https://afribary.com/works/design-and-contruction-of-automatic-phase-selector-7131 >.

Chicago

Raji, Alex . "DESIGN AND CONTRUCTION OF AUTOMATIC PHASE SELECTOR" Afribary (2018). Accessed December 26, 2024. https://afribary.com/works/design-and-contruction-of-automatic-phase-selector-7131