Technical Report Summary Egbin Transmission Company of Nigeria Sub Region (13th to 24th April 2015)

TABLE OF CONTENT 


1. Introduction 

2. Electrical department 

3. Lines department 

4. System Operations department 

5. P C &M (Protection Control and Metering) department 

6. Conclusion

Subscribe to access this work and thousands more
Overall Rating

0

5 Star
(0)
4 Star
(0)
3 Star
(0)
2 Star
(0)
1 Star
(0)
APA

Oko, C. (2018). Technical Report Summary Egbin Transmission Company of Nigeria Sub Region (13th to 24th April 2015). Afribary. Retrieved from https://afribary.com/works/power-generation-935

MLA 8th

Oko, Chidi "Technical Report Summary Egbin Transmission Company of Nigeria Sub Region (13th to 24th April 2015)" Afribary. Afribary, 29 Jan. 2018, https://afribary.com/works/power-generation-935. Accessed 19 Apr. 2024.

MLA7

Oko, Chidi . "Technical Report Summary Egbin Transmission Company of Nigeria Sub Region (13th to 24th April 2015)". Afribary, Afribary, 29 Jan. 2018. Web. 19 Apr. 2024. < https://afribary.com/works/power-generation-935 >.

Chicago

Oko, Chidi . "Technical Report Summary Egbin Transmission Company of Nigeria Sub Region (13th to 24th April 2015)" Afribary (2018). Accessed April 19, 2024. https://afribary.com/works/power-generation-935