Taking off Processes and Preparation of an Un-Priced Bill of Quantities (A Case Study of the Proposed Four (4) Bedroom Fully Detached Duplex at Plot 3003a and 3003b Sabonlugbe East Extention

ABSTRACT

         Class work alone on measurement of building work is not enough to equipped the student with the required knowledge and skill required on the measurement of building work, it is against this background that the introduction of project work was introduce to expose the student to a practical and theoretical method of taking off of building work apart from class work so as to increase their skill and knowledge in addition to classwork. Chapter one of this project demonstrates the aims and objectives of this research, the scope and limitations while chapters two and three represent a literature review on measurement of building work in order to have a better understanding of taking off, abstracting and billing processes prepared in a chapter for the proposed four (4) bedroom fully detached duplex.

TABLE OF CONTENTS

Title Page

Certification

Dedication

Acknowledgment

Abstract

 

CHAPTER ONE

1.0      Introduction

1.1      Description of Work

1.2      Aims and Objective

1.3      Scope and Limitation

 

CHAPTER TWO

2.0    Literature Review (Introduction)

2.1    Site Report

2.2    Preliminaries

2.3    Process Involved in preparing an un-priced bill of quantities

2.4    Format of bill of quantities

 

CHAPTER THREE

3.0    Process Of Preparing A Bill Of Quantities

3.1    Taking off processes

3.1.1         Studying the Drawing

3.1.2         Querry Sheet

3.1.3         Taking Off list

3.1.4         Read and Scale Dimension

3.1.5         Taking Off sheet

3.1.6         Recording of scaled or read dimension

3.1.7         Waste Calculation

3.1.8         Signposting

3.2    Squaring

3.2.1         Linear Meter (m)

3.2.2         Square Meter (m2)

3.2.3         Cubic Meter (m3)

3.2.4         General Item (nr5)

3.2.5         PCs/PS

3.3    Abstracting

3.4    Billing

3.4.1         Groundwork

3.4.2         Superstructural work.

 

CHAPTER FOUR

4.0    Introduction

4.1    Taking Off For The Complete Four (4) Bedroom Fully Detached Duplex.

4.2    Abstracts and Bill of Qualities for the Substructure (Groundwork) only.

4.3    Taking Off the Superstructure

 

CHAPTER FIVE

5.0    Summary

5.1    Conclusion

5.2    Recommendation

 

 

 


Overall Rating

0

5 Star
(0)
4 Star
(0)
3 Star
(0)
2 Star
(0)
1 Star
(0)
APA

ADISA, A , MOTOLANI, A & LATEEF, H (2021). Taking off Processes and Preparation of an Un-Priced Bill of Quantities (A Case Study of the Proposed Four (4) Bedroom Fully Detached Duplex at Plot 3003a and 3003b Sabonlugbe East Extention . Afribary. Retrieved from https://afribary.com/works/taking-off-processes-and-preparation-of-an-un-priced-bill-of-quantities-a-case-study-of-the-proposed-four-4-bedroom-fully-detached-duplex-at-plot-3003a-and-3003b-sabonlugbe-east-extention-lay

MLA 8th

ADISA, ABDULSALAM et. al. "Taking off Processes and Preparation of an Un-Priced Bill of Quantities (A Case Study of the Proposed Four (4) Bedroom Fully Detached Duplex at Plot 3003a and 3003b Sabonlugbe East Extention " Afribary. Afribary, 17 Dec. 2021, https://afribary.com/works/taking-off-processes-and-preparation-of-an-un-priced-bill-of-quantities-a-case-study-of-the-proposed-four-4-bedroom-fully-detached-duplex-at-plot-3003a-and-3003b-sabonlugbe-east-extention-lay. Accessed 23 Dec. 2024.

MLA7

ADISA, ABDULSALAM, AHMED MOTOLANI and HAMZAT LATEEF . "Taking off Processes and Preparation of an Un-Priced Bill of Quantities (A Case Study of the Proposed Four (4) Bedroom Fully Detached Duplex at Plot 3003a and 3003b Sabonlugbe East Extention ". Afribary, Afribary, 17 Dec. 2021. Web. 23 Dec. 2024. < https://afribary.com/works/taking-off-processes-and-preparation-of-an-un-priced-bill-of-quantities-a-case-study-of-the-proposed-four-4-bedroom-fully-detached-duplex-at-plot-3003a-and-3003b-sabonlugbe-east-extention-lay >.

Chicago

ADISA, ABDULSALAM , MOTOLANI, AHMED and LATEEF, HAMZAT . "Taking off Processes and Preparation of an Un-Priced Bill of Quantities (A Case Study of the Proposed Four (4) Bedroom Fully Detached Duplex at Plot 3003a and 3003b Sabonlugbe East Extention " Afribary (2021). Accessed December 23, 2024. https://afribary.com/works/taking-off-processes-and-preparation-of-an-un-priced-bill-of-quantities-a-case-study-of-the-proposed-four-4-bedroom-fully-detached-duplex-at-plot-3003a-and-3003b-sabonlugbe-east-extention-lay