1.1 GENERAL INTRODUCTION1

1.2 CONSEQUENCES OF SLOPE FAILURES1

                     CHAPTER   TWO

2. 0 DETERMINATION OF POTENTIAL FAILURE GEOMETRY4

2.1.1 Plane Failure4

2.1.2 Wedge failure4

2.1.3 Step path failure4

2.1.4. Raveling failure5

2.1.5 Toppling failure5

2.2 RECOGNIZING HAZARDS6

2.2.1 Tension crack6

2.2.2 Scarps7

2.2.3 Abnormal water flow7

2.2.4 Bulges or Creep7

2.2.5 Rubble at the toe8

2.3 MONITORING EQUIPMENT8

2.3.1 Survey Network9

2.3.2 Wire line Extensometers

2.3.3 Inclinometers11

2.3.4 Piezometers13

2.3.5 Borehole Extensometers14

2.4.4 IMPLEMENTING A MONITORING PLANS15

2.5. DATA REDUCTION & ANALYSIS16

 CHAPTER THREE 

3.1 SLOPE STABILIZATION METHODS &PRE-PLANNEDRESPONSE 

TO MOVEMENT                                    18

3.1.1 Let the material fail18

3.1.2 Support the material19

3.1.3Remove the hazard19

3.2. FUTURE MONITORING TECHNOLOGIES19

             CHAPTERN FOUR

4.0CONCLUSION20


Subscribe to access this work and thousands more
Overall Rating

0

5 Star
(0)
4 Star
(0)
3 Star
(0)
2 Star
(0)
1 Star
(0)
APA

Busari, S. (2018). ASSESSING AND MONITORING OPEN PIT MINE. Afribary. Retrieved from https://afribary.com/works/assessing-and-monitoring-open-pit-mine

MLA 8th

Busari, Saheed "ASSESSING AND MONITORING OPEN PIT MINE" Afribary. Afribary, 19 Dec. 2018, https://afribary.com/works/assessing-and-monitoring-open-pit-mine. Accessed 23 Apr. 2024.

MLA7

Busari, Saheed . "ASSESSING AND MONITORING OPEN PIT MINE". Afribary, Afribary, 19 Dec. 2018. Web. 23 Apr. 2024. < https://afribary.com/works/assessing-and-monitoring-open-pit-mine >.

Chicago

Busari, Saheed . "ASSESSING AND MONITORING OPEN PIT MINE" Afribary (2018). Accessed April 23, 2024. https://afribary.com/works/assessing-and-monitoring-open-pit-mine