Tag: Selected project topics in Construction Management / Construction Technology
10
Sep '15
Design And Construction Of A 40ft Adjustable Ladder
ABSTRACT The work was an attempt to evolve a quicker and easier means of reaching high places and point safely in tall buildings and other high structures. This has no doubt saved consideration cost of employing cranes. A very clear account of the introduction and literature background of the project has been discussed in details. […]