ABSTRACT
This study focused on the challenges of manpower development and utilization in the Rivers State Local Government system. The study was interested in examining the extent inadequate manpower development affected productivity in the Rivers State Local Government system; ascertaining whether manpower development programmes were based on the manpower needs of the Rivers State Local Government system; and determining whether educational training could serve as manpower development strategy to improve workers’ productivity in the Rivers State Local Government system between 1999 and 2011. Using the ex-post facto research design and the general systems theory as tool of analysis, the study concluded that the attention given to manpower development and utilization by the Rivers State Local Government Service Commission is minimal. The study among others recommended that there is need to give maximum attention to staff training and development by the management of the Local Government Service as it will enable employees to adapt well to the changing trends and increasing complexities in service delivery. Training needs should be considered on the basis of overall company objective. The goals of the local government should determine what training programmes are to be organized for staff. Staff should be motivated to add value to themselves and to their lives.
Key Words: Challenges, Manpower Development, Utilization, Local Government, Rivers State
TABLE OF CONTENTS
Title Page……………………………………………………………....…….....… i
Approval Page…............…………………………………………………..….....…… ii
Dedication…………...………………………………………………..…….....… iii
Acknowledgments……………………………………………………………….....…….iv
Table of Contents……………………………………………………………..……......… v
Abstract…………………………………………………………………..........vii
CHAPTER ONE: INTRODUCTION
1.1. Background to the Study…………………………………………….………..….....…1
1.2. Statement of the Problem……………………………………………………......……3
1.3. Objective of the Study…………………………………………………….……….....…5
1.4. Significance of the Study………………………………………………………….....…6
1.5. Operationalization of Key Concepts................................................................................7
CHAPTER TWO: LITERATURE REVIEW
2.1. Manpower Development and Productivity in the Local Government System..…........17
2.2. Manpower Development Programmes and Manpower Needs of the Local Government System.......................….....................28
2.3. Education and Impact on Workers’ Productivity in Rivers State Local Government System.............................................................................................43
CHAPTER THREE: METHODOLOGY
3.1. Theoretical Framework.............................................................................................….54
3.2. Hypotheses.................................................................................................…................60
3.3. Research Design….........................................................................................................60
3.4. Methods of Data Collection....................................................................................…...63
3.5. Methods of Data Analysis.......................................................................................…...64
3.6. Logical Data Framework…...........................................................................................12
CHAPTER FOUR: ORGANIZATIONAL STRUCTURE OF THE RIVERS STATE LOCAL GOVERNMENT SYSTEM
4.1. Origin of the Nigerian Local Government Service….....................................................67
4.2. Functions of the Local Government Service Commission……............................……72
4.3. Organogram of the Rivers State Local Government System..........................................77
CHAPTER FIVE: PROBLEMS AND CHALLENGES IN RIVERS LOCAL GOVERNMENT MANPOWER DEVELOPMENT AND UTILIZATION
5.1. Problems of Manpower Development....................................................................…...80
5.2. Challenges of Manpower Utilization…………..........……………………………..….94
5.3. Problems of Manpower Development....................................................................…...98
5.4. Challenges of Manpower Utilization…………………………………….………......104
CHAPTER SIX: SUMMARY, CONCLUSION AND RECOMMENDATIONS
6.1. Summary …..................................................................................................................118
6.2. Conclusion …...............................................................................................................119
6.3. Recommendations …....................................................................................................120
Bibliography ….............................................................................................................124
Consults, E. & M, J (2022). Challenges of Manpower Development and Utilization in the Rivers State Local Government, 1999- 2011. Afribary. Retrieved from https://afribary.com/works/challenges-of-manpower-development-and-utilization-in-the-rivers-state-local-government-1999-2011
Consults, Education, and JACK M "Challenges of Manpower Development and Utilization in the Rivers State Local Government, 1999- 2011" Afribary. Afribary, 21 Dec. 2022, https://afribary.com/works/challenges-of-manpower-development-and-utilization-in-the-rivers-state-local-government-1999-2011. Accessed 27 Dec. 2024.
Consults, Education, and JACK M . "Challenges of Manpower Development and Utilization in the Rivers State Local Government, 1999- 2011". Afribary, Afribary, 21 Dec. 2022. Web. 27 Dec. 2024. < https://afribary.com/works/challenges-of-manpower-development-and-utilization-in-the-rivers-state-local-government-1999-2011 >.
Consults, Education and M, JACK . "Challenges of Manpower Development and Utilization in the Rivers State Local Government, 1999- 2011" Afribary (2022). Accessed December 27, 2024. https://afribary.com/works/challenges-of-manpower-development-and-utilization-in-the-rivers-state-local-government-1999-2011