Technical Report Summary Egbin Transmission Company of Nigeria Sub Region (13th to 24th April 2015)

TABLE OF CONTENT 


1. Introduction 

2. Electrical department 

3. Lines department 

4. System Operations department 

5. P C &M (Protection Control and Metering) department 

6. Conclusion